Project Profile #1
- 194,000 square feet
- 15+ year-old HYPALON single-ply roof system over a built-up roof system on a metal deck
- All other recommendations called for complete roof replacement by removing existing roof and underlying components down to metal deck
- Lan-Way Roofing removed and replaced isolated areas of wet and damaged insulation and restored the roof by applying a polyurethane, elastomeric two-coat, coating system
- Owner saved over $1,000,000.00

Project Profile #2
- 370,000 square feet
- 20+ year-old existing built-up roof system over a gypsum plank deck
- Lan-Way Roofing removed loose gravel and debris and recovered existing roof with a wind vented EPDM roof system

Project Profile #3
- 110,000 square feet
- Aging built-up roof system over a metal deck